Megapolis Wiki
Advertisement
This page relates to the new version of the Vancouver Office Center. For old version, see Vancouver Office Center.

The Vancouver Office Center is a production structure located on the north corner of the Business Island. It was originally introduced on Mon April 11, 2016 as part of the timed quest called Business Island.[1]

A total of 110 assets are needed to complete construction of the Vancouver Office Center. This is equivalent to 110 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.


Gallery[]

Assets[]

Level 1 Vancouver Office Center[]

No assets required

Level 2 Vancouver Office Center[]

Asset Image Amount Price Cost
Aluminum Profile Asset Aluminum Profile 10x 1 Megabucks sm 10 Megabucks sm
Glass Asset Glass 5x 1 Megabucks sm 5 Megabucks sm
Tiles Asset Tiles 10x 1 Megabucks sm 10 Megabucks sm
25 Assets 25 Megabucks sm

Level 3 Vancouver Office Center[]

Asset Image Amount Price Cost
Bitumen Asset Bitumen 15x 1 Megabucks sm 15 Megabucks sm
Wire Rope Asset Cords 15x 1 Megabucks sm 15 Megabucks sm
Underground Storage Tank Asset Underground Reservoirs 10x 1 Megabucks sm 10 Megabucks sm
40 Assets 40 Megabucks sm

Level 4 Vancouver Office Center[]

Asset Image Amount Price Cost
LEDs Asset LEDs 15x 1 Megabucks sm 15 Megabucks sm
Metal Detector Asset Metal Detector 10x 1 Megabucks sm 10 Megabucks sm
Multifunctional Monitor Asset Multi-Functional Monitor 10x 1 Megabucks sm 10 Megabucks sm
Automatic Doors Asset Photoelectric Doors 10x 1 Megabucks sm 10 Megabucks sm
45 Assets 45 Megabucks sm

Contracts[]

Level 1 Vancouver Office Center[]

"Additional requirements for this contracts: Level 1 Financial Analysis Department & Level 1 Center of Investment"
Level 1 Vancouver Office Center: Contracts
NameCostCoin smDurationRewardCoin smXPExperience smCoinsCoin sm/MinuteXPExperience sm/MinuteRequirements
Contract Short-Term Credit
Short-Term Credit (I)[C 1]
650 Coin sm
+
1,500 Coin sm
4 hours 1,300 Coin sm
+
3,100 Coin sm
4 Experience sm
+
4 Experience sm
2.70 Coin sm
+
6.70 Coin sm
0.02 Experience sm
+
0.02 Experience sm
No additional requirements
Contract Medium-Term Credit
Medium-Term Credit (I)[C 1]
1,150 Coin sm
+
2,650 Coin sm
8 hours 2,400 Coin sm
+
5,400 Coin sm
6 Experience sm
+
6 Experience sm
2.60 Coin sm
+
5.70 Coin sm
0.01 Experience sm
+
0.01 Experience sm
No additional requirements
Contract Long-Term Credit
Long-Term Credit (I)[C 1]
2,250 Coin sm
+
5,250 Coin sm
19 hours 4,600 Coin sm
+
10,800 Coin sm
10 Experience sm
+
10 Experience sm
2.10 Coin sm
+
4.90 Coin sm
0.01 Experience sm
+
0.01 Experience sm
No additional requirements


  1. 1.0 1.1 1.2 Top costs, rewards and experience are multiplied by up to 5 x Financial Analysis Department (Level 1 or 2);
    Bottom costs and rewards are multiplied by up to 5 x Center of Investment (Level 1 or 2)

Level 2 Vancouver Office Center[]

"Additional requirements for this contracts: Level 2 Financial Analysis Department & Level 1 Center of Investment"
Level 2 Vancouver Office Center: Contracts
NameCostCoin smDurationRewardCoin smXPExperience smCoinsCoin sm/MinuteXPExperience sm/MinuteRequirements
Contract Short-Term Credit
Short-Term Credit (II)[C 1]
950 Coin sm
+
2,150 Coin sm
4 hours and 30 minutes 2,200 Coin sm
+
4,900 Coin sm
9 Experience sm
+
9 Experience sm
4.60 Coin sm
+
10.20 Coin sm
0.03 Experience sm
+
0.03 Experience sm
No additional requirements
Contract Medium-Term Credit
Medium-Term Credit (II)[C 1]
1,700 Coin sm
+
3,900 Coin sm
9 hours 3,900 Coin sm
+
8,800 Coin sm
14 Experience sm
+
14 Experience sm
4.10 Coin sm
+
9.10 Coin sm
0.03 Experience sm
+
0.03 Experience sm
No additional requirements
Contract Long-Term Credit
Long-Term Credit (II)[C 1]
3,100 Coin sm
+
7,200 Coin sm
20 hours 7,000 Coin sm
+
16,300 Coin sm
20 Experience sm
+
20 Experience sm
3.30 Coin sm
+
7.60 Coin sm
0.02 Experience sm
+
0.02 Experience sm
No additional requirements


  1. 1.0 1.1 1.2 Top costs, rewards and experience are multiplied by up to 5 x Financial Analysis Department (Level 2);
    Bottom costs and rewards are multiplied by up to 5 x Center of Investment (Level 1 or 2)

Level 3 Vancouver Office Center[]

"Additional requirements for this contracts: Level 2 Financial Analysis Department & Level 1 Center of Investment"
Level 3 Vancouver Office Center: Contracts
NameCostCoin smDurationRewardCoin smXPExperience smCoinsCoin sm/MinuteXPExperience sm/MinuteRequirements
Contract Short-Term Credit
Short-Term Credit (III)[C 1]
1,050 Coin sm
+
2,450 Coin sm
5 hours 2,700 Coin sm
+
6,300 Coin sm
15 Experience sm
+
15 Experience sm
5.50 Coin sm
+
12.80 Coin sm
0.05 Experience sm
+
0.05 Experience sm
No additional requirements
Contract Medium-Term Credit
Medium-Term Credit (III)[C 1]
1,900 Coin sm
+
4,400 Coin sm
10 hours 4,900 Coin sm
+
11,400 Coin sm
23 Experience sm
+
23 Experience sm
5 Coin sm
+
11.70 Coin sm
0.04 Experience sm
+
0.04 Experience sm
No additional requirements
Contract Long-Term Credit
Long-Term Credit (III)[C 1]
3,300 Coin sm
+
7,650 Coin sm
21 hours 8,500 Coin sm
+
19,800 Coin sm
32 Experience sm
+
32 Experience sm
4.10 Coin sm
+
9.60 Coin sm
0.03 Experience sm
+
0.03 Experience sm
No additional requirements


  1. 1.0 1.1 1.2 Top costs, rewards and experience are multiplied by up to 5 x Financial Analysis Department (Level 2);
    Bottom costs and rewards are multiplied by up to 5 x Center of Investment (Level 1 or 2)

Level 4 Vancouver Office Center[]

"Additional requirements for this contracts: Level 2 Financial Analysis Department & Level 2 Center of Investment"
Level 4 Vancouver Office Center: Contracts
NameCostCoin smDurationRewardCoin smXPExperience smCoinsCoin sm/MinuteXPExperience sm/MinuteRequirements
Contract Short-Term Credit
Short-Term Credit (IV)[C 1]
1,250 Coin sm
+
2,850 Coin sm
5 hours and 30 minutes 3,900 Coin sm
+
8,900 Coin sm
22 Experience sm
+
22 Experience sm
8 Coin sm
+
18.30 Coin sm
0.07 Experience sm
+
0.07 Experience sm
No additional requirements
Contract Medium-Term Credit
Medium-Term Credit (IV)[C 1]
2,250 Coin sm
+
5,150 Coin sm
11 hours 7,000 Coin sm
+
16,100 Coin sm
33 Experience sm
+
33 Experience sm
7.20 Coin sm
+
16.60 Coin sm
0.05 Experience sm
+
0.05 Experience sm
No additional requirements
Contract Long-Term Credit
Long-Term Credit (IV)[C 1]
3,700 Coin sm
+
8,550 Coin sm
22 hours 11,500 Coin sm
+
26,700 Coin sm
44 Experience sm
+
44 Experience sm
5.90 Coin sm
+
13.80 Coin sm
0.03 Experience sm
+
0.03 Experience sm
No additional requirements


  1. 1.0 1.1 1.2 Top costs, rewards and experience are multiplied by up to 5 x Financial Analysis Department (Level 2);
    Bottom costs and rewards are multiplied by up to 5 x Center of Investment (Level 2)

Data[]

LevelPopulation LimitsXPPowerWaterAdditional Access
Level 05,000 Population Limits (+5,000)250 Experience sm (+250)10 Power sm (+10)5 Water sm (+5)
  • Access to all Level 1 contracts above after completion of other contract requirements.
Level 115,000 Population Limits (+10,000)400 Experience sm (+150)15 Power sm (+5)10 Water sm (+5)
  • Access to all Level 2 contracts above after completion of other contract requirements.
Level 240,000 Population Limits (+25,000)550 Experience sm (+150)20 Power sm (+5)15 Water sm (+5)
  • Access to all Level 3 contracts above after completion of other contract requirements.
Level 370,000 Population Limits (+30,000)750 Experience sm (+200)25 Power sm (+5)20 Water sm (+5)
  • Access to all Level 4 contracts above after completion of other contract requirements.
Total/Max70,000 Population Limits1,950 Experience sm25 Power sm20 Water sm

Trivia[]

SQ Internal Info:
  • Name: Офисный центр "Ванкувер" (translates to Office center "Vancouver")
  • ID: 13617 (office_center_vancouver_place)

References[]

Advertisement