
The Silicon Industrial Complex is an industrial hub located on the northern north east border of the Mountain Plains expansion zone in Industrial Complex. It was originally introduced on Wed July 15, 2015.[1]
A total of 510 assets and additional 4,250,000 worth diagrams are needed to complete construction of the Silicon Industrial Complex. This is equivalent to 510
if one were to buy every asset instead of waiting to receive them from neighbors.
On Tue July 21, 2015, coin assets' values were updated as follows:
- Level 3 requires 02 x Assembly Diagram
(Before 1)
- Level 4 requires 03 x Engineering Diagram
(Before 1)
- New total 4,250,000
(Before 1,750,000)
Events and Achievements[]
- See Industrial Complex for all related Achievements
Requirements[]
Silicon Industrial Complex (Level 1)[]

Requires | Rewards |
---|---|
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Air Purifier | ![]() |
10x | 1 ![]() |
10 ![]() |
Perforated Brick | ![]() |
18x | 1 ![]() |
18 ![]() |
Concrete Rings | ![]() |
17x | 1 ![]() |
17 ![]() |
Paint | ![]() |
10x | 1 ![]() |
10 ![]() |
Thermal Insulation | ![]() |
15x | 1 ![]() |
15 ![]() |
Silicon Industrial Complex: Quartz Processing Section (Level 2)[]

Requires | Rewards |
---|---|
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Bracket | ![]() |
14x | 1 ![]() |
14 ![]() |
Bricks | ![]() |
18x | 1 ![]() |
18 ![]() |
Detailed Diagram | ![]() |
1x | 250,000 ![]() |
250,000 ![]() |
First Aid Kit | ![]() |
16x | 1 ![]() |
16 ![]() |
Fuel Tablets | ![]() |
17x | 1 ![]() |
17 ![]() |
Limestone | ![]() |
15x | 1 ![]() |
15 ![]() |
Rebar | ![]() |
16x | 1 ![]() |
16 ![]() |
Water Pump | ![]() |
14x | 1 ![]() |
14 ![]() |
Silicon Industrial Complex: Smelting Section (Level 3)[]

Requires | Rewards |
---|---|
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Assembly Diagram | ![]() |
2x | 500,000 ![]() |
1,000,000 ![]() |
Channel | ![]() |
20x | 1 ![]() |
20 ![]() |
Concrete Blocks | ![]() |
16x | 1 ![]() |
16 ![]() |
Gypsum Fibreboard | ![]() |
17x | 1 ![]() |
17 ![]() |
Holding Angle | ![]() |
10x | 1 ![]() |
10 ![]() |
Insulation Foam | ![]() |
18x | 1 ![]() |
18 ![]() |
Luminescent Lamps | ![]() |
14x | 1 ![]() |
14 ![]() |
Perforator Drill | ![]() |
15x | 1 ![]() |
15 ![]() |
Sandstone | ![]() |
17x | 1 ![]() |
17 ![]() |
Scaffolding Cover | ![]() |
16x | 1 ![]() |
16 ![]() |
Water Heater | ![]() |
17x | 1 ![]() |
17 ![]() |
Silicon Industrial Complex: Crushing Section (Level 4)[]

Requires | Rewards |
---|---|
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Adaptable Screwdriver | ![]() |
16x | 1 ![]() |
16 ![]() |
Concrete Slabs | ![]() |
17x | 1 ![]() |
17 ![]() |
Engineering Diagram | ![]() |
3x | 1,000,000 ![]() |
3,000,000 ![]() |
Lightweight Concrete | ![]() |
18x | 1 ![]() |
18 ![]() |
Heavy Duty Adhesive | ![]() |
17x | 1 ![]() |
17 ![]() |
Pantograph | ![]() |
16x | 1 ![]() |
16 ![]() |
Plastic Panels | ![]() |
15x | 1 ![]() |
15 ![]() |
Polymer Pipes | ![]() |
20x | 1 ![]() |
20 ![]() |
Self-Tapping Screw | ![]() |
15x | 1 ![]() |
15 ![]() |
Sound Insulation | ![]() |
18x | 1 ![]() |
18 ![]() |
Thermal Insulation | ![]() |
18x | 1 ![]() |
18 ![]() |
Data[]
Level | XP | Power | Water | Coin Production[d 1] | Resource Production[d 2] | Coin Storage | Resource Storage |
---|---|---|---|---|---|---|---|
0 | 700 ![]() |
12 ![]() (+12) |
11 ![]() (+11) |
— | — | — | — |
1 | 1,100 ![]() |
33 ![]() (+21) |
25 ![]() (+14) |
2,566 ![]() |
4 ![]() |
25,600 ![]() |
40 ![]() |
2 | 1,500 ![]() |
63 ![]() (+30) |
42 ![]() (+17) |
5,801 ![]() |
9 ![]() |
44,800 ![]() |
70 ![]() |
3 | 2,000 ![]() |
102 ![]() (+39) |
62 ![]() (+20) |
12,867 ![]() |
20 ![]() |
76,800 ![]() |
120 ![]() |
4 | 2,600 ![]() |
150 ![]() (+48) |
85 ![]() (+23) |
26,895 ![]() |
42 ![]() |
128,000 ![]() |
200 ![]() |
Total/Max | 7,900 ![]() |
150 ![]() |
85 ![]() |
26,895 ![]() |
42 ![]() |
128,000 ![]() |
200 ![]() |
- ↑
Bonus:
Unique Building Bonus Production Rate Level 1 Level 2 Level 3 Level 4 Wood Processing Factory +640 /hour
+1280 /hour
+1920 /hour
+2560 /hour
Geological Survey Service +640 /hour
+1280 /hour
+1920 /hour
+2560 /hour
Industrial Automation Bureau +640 /hour
+1280 /hour
+1920 /hour
+2560 /hour
- ↑
Bonus:
Unique Building Bonus Production Rate Level 1 Level 2 Level 3 Level 4 Wood Processing Factory +1/hour +2/hour +3/hour +4/hour Geological Survey Service +1/hour +2/hour +3/hour +4/hour Industrial Automation Bureau +1/hour +2/hour +3/hour +4/hour
Trivia[]
- SQ Internal Info:
- Name: Кремниевый промышленный комплекс (translates to Silicon industry)
- ID: 23046 (mining_silicon_station_place)