Megapolis Wiki
Advertisement
Salamander Bridge (Foundation)
Salamander Bridge Construction
Plot Fixed
Cost 63,000 Coin sm
3 Megabucks sm
Power sm
Water sm
Provides 800 Experience sm
No periodic benefit
Construction Instant


Salamander Bridge Initial

The Salamander Bridge is a Las Megas Bridge connecting the third Las Megas Island with the fourth island. It was added during an update on 03.06.2015 as part of the Las Megas Island Update.[1]

A total of 120 assets are needed to complete construction of the Salamander Bridge. This is equivalent to 120 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.


Quests and Achievements[]

Achievements

Requirements[]

Salamander Bridge (Level 1)[]

Salamander Bridge L1
Requires Rewards
  • 120 Megabucks sm or 120 asset gifts
Asset Image Amount Price Cost
Aluminum Profile Asset Aluminum Profile x 12 1 Megabucks sm 12 Megabucks sm
Automated Barrier Gate Asset Automated Barrier Gate x 7 1 Megabucks sm 7 Megabucks sm
Channel Asset Channel x 13 1 Megabucks sm 13 Megabucks sm
Concrete Slabs Asset Concrete Slabs x 15 1 Megabucks sm 15 Megabucks sm
Searchlight Asset Searchlight x 12 1 Megabucks sm 12 Megabucks sm
Surveillance Systems Asset Surveillance Systems x 18 1 Megabucks sm 18 Megabucks sm
T-beam Asset T-beam x 16 1 Megabucks sm 16 Megabucks sm
Tools Asset Tools x 13 1 Megabucks sm 13 Megabucks sm
Welding Machine Asset Welding Machine x 14 1 Megabucks sm 14 Megabucks sm

Trivia[]

SQ Internal Info:
  • Name: Мост "Саламандра" (translates to Bridge "Salamander")
  • ID: 10047115 (salamander_bridge_place)

References[]

  1. SQ Forum: Update 03.06.2015
  2. Before Fri June 19, 2015, the requirement was Level 28
Advertisement