Megapolis Wiki


The Loading System is an infrastructure structure located on the New Airport on the south-west side of Marina expansion zone. It was originally introduced on Thu November 26, 2015 as part of the timed quest called New Airport.[1]

A total of 290 assets and additional 1,450,000  worth diagrams are needed to complete construction of the Loading System. This is equivalent to 300  if one were to buy every asset instead of waiting to receive them from neighbors.


Gallery[]

Assets[]

Loading System (Level 1)[]

Asset Image Amount Price Cost
Standard Diagram 1x 100,000  100,000 
1 Diagram 100,000 

Modernized Loading System (Level 2)[]

Asset Image Amount Price Cost
Adaptable Screwdriver 6x 1  6 
Cargo Container 11x 1  11 
Eco Wool 9x 1  9 
Forklift 10x 1  10 
Maintenance Ladder 4x 1  4 
Standard Diagram 1x 100,000  100,000 
40 Assets
1 Diagram
40 
100,000 

Multi-functional Loading System (Level 3)[]

Asset Image Amount Price Cost
Adaptable Screwdriver 12x 1  12 
Anti-Corrosive Primer 10x 1  10 
Construction Adhesive 15x 1  15 
Detailed Diagram 1x 250,000  250,000 
Engineering Software 10x 1  10 
Flight Schedule 3x 1  3 
Gas Filter 8x 1  8 
Forklift 15x 1  15 
Pantograph 5x 1  5 
Stepladder 10x 1  10 
Surveillance Systems 12x 1  12 
100 Assets
1 Diagram
100 
250,000 

Universal Loading System (Level 4)[]

Asset Image Amount Price Cost
Access Control System 12x 1  12 
Bituminous Rubber Cement 10x 1  10 
Staple 10x 1  10 
Cargo Container 20x 1  20 
Eco Wool 10x 1  10 
Engineering Diagram 1x 1,000,000  1,000,000 
Engineering Software 18x 1  18 
Laser Level 5x 3  15 
Forklift 20x 1  20 
Maintenance Ladder 15x 1  15 
Pantograph 10x 1  10 
Surveillance Systems 20x 1  20 
150 Assets
1 Diagram
160 
1,000,000 

Data[]

LevelPopulation LimitsXPPowerWaterAdditional Access
Level 01,500  (+1,500)200  (+200)4  (+4)4  (+4)
Level 16,000  (+4,500)450  (+250)10  (+6)10  (+6)
Level 213,500  (+7,500)700  (+250)25  (+15)20  (+10)
Level 324,000  (+10,500)900  (+200)45  (+20)30  (+10)
Level 438,000  (+14,000)1,250  (+350)70  (+25)45  (+15)
Total/Max38,000 3,500 70 45 

Trivia[]

SQ Internal Info:
  • Name: Погрузочный комплекс (translates to Shipping Complex)
  • ID: 10071085 (big_airport_loading_complex_place)

References[]