Megapolis Wiki
Register
Advertisement


The Hydrological Research Center is a production structure located south of the Desert, next to the Military Shipyard. It was originally introduced on Thu May 18, 2017 as part of the timed quest called Whirlpool of Events.[1]

A total of 100 assets are needed to complete construction of the Hydrological Research Center. This is equivalent to 100 Megabucks sm if one were to buy every asset instead of waiting to receive them from neighbors.


Gallery[]

Assets[]

Hydrological Research Center[]

Asset Image Amount Price Cost
Mixed Concrete Asset Concrete Mixer 5x 1 Megabucks sm 5 Megabucks sm
Iron Beams Asset Iron Beams 5x 1 Megabucks sm 5 Megabucks sm
10 Assets 10 Megabucks sm

Main Hydrology Institute[]

Asset Image Amount Price Cost
Cement Asset Cement 11x 1 Megabucks sm 11 Megabucks sm
Composite Grid Asset Composite Grid 9x 1 Megabucks sm 9 Megabucks sm
Flexible Hoses Asset Flexible Hoses 13x 1 Megabucks sm 13 Megabucks sm
Hygrograph Asset Hygrograph 8x 1 Megabucks sm 8 Megabucks sm
Insulation Asset Insulation 12x 1 Megabucks sm 12 Megabucks sm
Pipe Cutter Asset Pipe Cutter 15x 1 Megabucks sm 15 Megabucks sm
Polymer Pipes Asset Polymer Pipes 12x 1 Megabucks sm 12 Megabucks sm
Ball Valve Asset Valve (Industrial) 10x 1 Megabucks sm 10 Megabucks sm
90 Assets 90 Megabucks sm

Contracts[]

Hydrological Research Center: Contracts
NameCostCoin smDurationRewardCoin smXPExperience smCoinsCoin sm/MinuteXPExperience sm/MinuteRequirements
Contract Determining Current Speed and Type
Determining Current Speed and Type
370 Coin sm30 minutes1,600 Coin sm14 Experience sm41.00 Coin sm0.47 Experience smHydrological Research Center
Contract Sea Vessel Escort Patrol
Sea Vessel Escort Patrol
870 Coin sm1 hour3,800 Coin sm34 Experience sm48.83 Coin sm0.57 Experience smPatrol Service
Contract Installing Increased Capacity Hydroelectric Devices
Installing Increased Capacity Hydroelectric Devices
4,100 Coin sm3 hours17,900 Coin sm180 Experience sm76.67 Coin sm1.00 Experience smIncreased Capacity Hydroelectric Power Station
Contract Tuning the Monitoring and Control System
Tuning the Monitoring and Control System
9,100 Coin sm5 hours39,700 Coin sm380 Experience sm102.00 Coin sm1.27 Experience smMonitoring and Control Point
Contract Mapping Sea Floor Terrain
Mapping Sea Floor Terrain
14,800 Coin sm7 hours64,000 Coin sm610 Experience sm117.14 Coin sm1.45 Experience smMain Hydrology Institute
Contract Mapping Sea Currents
Mapping Sea Currents
18,300 Coin sm9 hours81,600 Coin sm790 Experience sm117.22 Coin sm1.46 Experience smSea Current Lab
Contract Reaching Record Power Production
Reaching Record Power Production[C 1]
26,500 Coin sm11 hours115,000 Coin sm1,100 Experience sm134.09 Coin sm1.67 Experience smHydroelectric Superstation
Contract Virtual Tour of Hydro Power Plants in Different Countries
Virtual Tour of Hydro Power Plants in Different Countries[C 2]
30,800 Coin sm12 hours134,000 Coin sm1,300 Experience sm143.33 Coin sm1.81 Experience smHydroelectric Museum


  1. Special Contract: 4 friends may assist, increasing reward by 400 Coin sm each; they receive 400 Coin sm each.
  2. Special Contract: 6 friends may assist, increasing reward by 600 Coin sm each; they receive 600 Coin sm each.

Data[]

LevelPopulation LimitsXPPowerWaterAdditional Access
Level 010,000 Population Limits (+10,000)200 Experience sm (+200)20 Power sm (+20)20 Water sm (+20)
Level 125,000 Population Limits (+15,000)400 Experience sm (+200)50 Power sm (+30)50 Water sm (+30)
  • Access to Determining Current Speed and Type contract above
Level 245,000 Population Limits (+20,000)500 Experience sm (+100)91 Power sm (+41)91 Water sm (+41)
  • Access to Mapping Sea Floor Terrain contract above
Total/Max45,000 Population Limits1,100 Experience sm91 Power sm91 Water sm

Trivia[]

SQ Internal Info:
  • Name: Центр гидрологических исследований (translates to Center for Hydrological Research)
  • ID: 10021500 (center_hydrological_research_place)

References[]


Advertisement