The Harbor Station is a transport hub located south of the Great Lakes expansion zone. It was originally introduced on Thu October 22, 2015.[1]
A total of 380 assets are needed to complete construction of the Harbor Station. This is equivalent to 380 if one were to buy every asset instead of waiting to receive them from neighbors.
Gallery[]
Assets[]
Harbor Station (Level 1)[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Adjustable Wrench | 14x | 1 | 14 | |
Composite Grid | 15x | 1 | 15 | |
Iron Beams | 14x | 1 | 14 | |
Concrete Pile | 10x | 1 | 10 | |
Thermal Insulation | 17x | 1 | 17 | |
70 Assets | 70 |
Harbor Station: Luggage Lockers (Level 2)[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Adaptable Screwdriver | 15x | 1 | 15 | |
Drywall | 13x | 1 | 13 | |
Heavy Duty Adhesive | 17x | 1 | 17 | |
Pipes | 16x | 1 | 16 | |
Reinforced Glass | 14x | 1 | 14 | |
Surveillance Systems | 15x | 1 | 15 | |
90 Assets | 90 |
Harbor Station: Business Class Waiting Room (Level 3)[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Access Control System | 15x | 1 | 15 | |
Mixed Concrete | 18x | 1 | 18 | |
Construction Netting | 15x | 1 | 15 | |
Solvent | 18x | 1 | 18 | |
Surface Hinge | 14x | 1 | 14 | |
Tiles | 16x | 1 | 16 | |
Water Pump | 14x | 1 | 14 | |
110 Assets | 110 |
Harbor Station: Official Delegation Hall (Level 4)[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Blowtorch | 10x | 1 | 10 | |
Buffer Stop | 13x | 1 | 13 | |
Concrete Slabs | 14x | 1 | 14 | |
Construction Adhesive | 15x | 1 | 15 | |
Signpost | 17x | 1 | 17 | |
Glass | 18x | 1 | 18 | |
Ramp | 10x | 1 | 10 | |
Steel Sheets | 13x | 1 | 13 | |
110 Assets | 110 |
Data[]
Level | XP | Resources | Production | |||||
---|---|---|---|---|---|---|---|---|
Power | Water | Limit | Rate[d 1] | Limit | Rate[d 2] | Max Cap Duration | ||
0 | 400 | 10 (+10 ) |
10 (+10 ) |
— | — | — | — | — |
1 | 800 | 50 (+40 ) |
30 (+20 ) |
36,000 | 2250/hour | 1,800 | 292.5/hour | 16:00:00 |
2 | 1,200 | 140 (+90 ) |
60 (+30 ) |
60,000 | 6750/hour | 3,000 | 337.5/hour | 08:53:20 |
3 | 1,600 | 250 (+110 ) |
120 (+60 ) |
80,000 | 10125/hour | 4,000 | 506.3/hour | 07:54:05 |
4 | 2,000 | 375 (+125 ) |
200 (+80 ) |
100,000 | 18140.6/hour | 5,000 | 907/hour | 05:30:45 |
Total/Max | 6,000 | 375 | 200 | 100,000 | 5,000 | — |
- ↑
Bonus:
Unique Building Bonus Coin Production Rate Level 1 Level 2 Level 3 Level 4 Rail Supply Center +105.50 /hour +228.50 /hour +386.70 /hour +562.50 /hour Technical Inspection Service +175.80 /hour +334 /hour +580.10 /hour +843.80 /hour Railroad Administration +281.30 /hour +562.50 /hour +984.40 /hour +1,388.70 /hour - ↑
Bonus:
Unique Building Bonus Passenger Flow Rate Level 1 Level 2 Level 3 Level 4 Rail Supply Center +5.3 /hour +11.4 /hour +19.3 /hour +28.1 /hour Technical Inspection Service +8.8 /hour +16.7 /hour +29 /hour +42.2 /hour Railroad Administration +14.1 /hour +28.1 /hour +49.2 /hour +69.4 /hour
Trivia[]
- SQ Internal Info:
- Name: Строительство вокзала “Гавань” (translates to Station "Harbor")
- ID: 72296 (train_station_haven_place)