The Flight Control Complex is a fixed location to the southeast of the starting zone, added during an update on 07.30.2013 as part of Operation Cosmic Shield timed quest.
A total of 65 assets are needed to complete construction of the Flight Control Complex. This is equivalent to 70 if one were to buy every asset instead of waiting to receive them from neighbors.