UNAVAILABLE STRUCTURE | |||
The Data Processing Center is an infrastructure structure located northeast of Paradise expansion. It was originally introduced on Thu April 12, 2018 as part of the timed quest called eSports Olympics.[1]
A total of 95 assets are needed to complete construction of the Data Processing Center. This is equivalent to 95 if one were to buy every asset instead of waiting to receive them from neighbors.
Assets[]
Data Processing Center Frame[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Alarm System | ![]() |
4x | 1 ![]() |
4 ![]() |
Aluminum Profile | ![]() |
3x | 1 ![]() |
3 ![]() |
Motion Sensor | ![]() |
5x | 1 ![]() |
5 ![]() |
Concrete Pile | ![]() |
4x | 1 ![]() |
4 ![]() |
Sling Hooks | ![]() |
4x | 1 ![]() |
4 ![]() |
20 Assets | 20 ![]() |
Data Processing Center[]
Asset | Image | Amount | Price | Cost |
---|---|---|---|---|
Floor Slabs | ![]() |
10x | 1 ![]() |
10 ![]() |
Insulation | ![]() |
9x | 1 ![]() |
9 ![]() |
LEDs | ![]() |
11x | 1 ![]() |
11 ![]() |
Maintenance Ladder | ![]() |
8x | 1 ![]() |
8 ![]() |
Automatic Doors | ![]() |
10x | 1 ![]() |
10 ![]() |
Surveillance Systems | ![]() |
11x | 1 ![]() |
11 ![]() |
Ventilation System | ![]() |
8x | 1 ![]() |
8 ![]() |
Welding Machine | ![]() |
8x | 1 ![]() |
8 ![]() |
75 Assets | 75 ![]() |
Data[]
Level | Population Limits | XP | Power | Water | Additional Access |
---|---|---|---|---|---|
Level 0 | 6,000 ![]() | 300 ![]() | 14 ![]() | 12 ![]() | — |
Level 1 | 22,100 ![]() | 800 ![]() | 34 ![]() | 29 ![]() | — |
Level 2 | 45,500 ![]() | 1,300 ![]() | 65 ![]() | 45 ![]() |
|
Total/Max | 45,500 ![]() | 2,400 ![]() | 65 ![]() | 45 ![]() | 1 contract |
Gallery[]
Click on an image to expand
Trivia[]
- SQ Internal Info:
- Name: Центр обработки данных (translates to Data processing center)
- ID: 100472371 (data_centre_place)
References[]
eSports Olympics | |
---|---|
• Team Battle Stadium • Dueling Zone • Data Processing Center • Artificial Intelligence Lab • Streaming Studio • Virtual Dueling Space | ![]() |